Client |
Torbay Council |
Location |
Davies Avenue, Paignton, Devon |
Budget |
Phase 1: £20,000
Phase 2: £90,000
Phase 3: £400,000 |
Completion |
July 2004 |
Phased extension and refurbishment of existing two storey split level school buildings in accordance with a master plan
Phase 1: Disabled lift installation.
Phase 2: New staff room, library and refurbishment of staff areas.
Phase 3: Two storey classroom extension to replace temporary classrooms.
Classrooms are planned on two levels with movable acoustic walls to afford layout flexibility. Classrooms open on to a common craft area located at the intermediate floor level by means of short stair flights. Craft area doubles as a circulation route and links through to the Library and main entrance. A specialist medical room and a music room with a verandah overlooking the playing fields were also provided. |
|